Items where Division is "Fakultas Teknik > Teknik Mesin (S1)" and Year is 2020

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type | No Grouping
Jump to: A | G | H | M | R | S | T | U | W
Number of items: 15.

A

ALI ABDI, HUSSEIN (2020) AIR POWER CAR-FUTURE OF TRANSPORTATION THESIS BOOK. Skripsi thesis, UNIVERSITAS SANGGA BUANA YPKP.

ALYASAR (2020) RANCANGAN PEMBANGKIT LISTRIK TENAGA OMBAK LAUT Ocean Wave Power Plant Design. Skripsi thesis, UNIVERSITAS SANGGA BUANA YPKP.

ANDRIYANI, YENI PUTRI (2020) ANALISIS POTENSI ENERGI ANGIN DAN PEMETAAN TEKNOLOGI TURBIN ANGIN DI SELURUH WILAYAH INDONESIA Analysis of Wind Energy Potency and Mapping of Wind Turbine Technology in All Regions of Indonesia. Skripsi thesis, UNIVERSITAS SANGGA BUANA YPKP.

G

GUSTI, REZA ANTONI (2020) PERANCANGAN ALAT PEMOTONG KENTANG. Skripsi thesis, UNIVERSITAS SANGGA BUANA YPKP BANDUNG.

Gusmao De Araujo, Ezequiel (2020) MODIFIKASI DAN PENGUJIAN MESIN PENCACAH SAMPAH ORGANIK RUMAH TANGGA. Skripsi thesis, UNIVERSITAS SANGGA BUANA YPKP.

H

Handriana, Yana and SUMIRAT, UUM (2020) ANALISA MEKANISME VARIABLE VALVE TIMING INTELLIGENT TERHADAP KINERJA MESIN TOYOTA AVANZA 3SZ-VE. Skripsi thesis, Universitas Sangga Buana YPKP.

M

MUHAMMAD RAINHARD, ALVIN (2020) RANCANG ULANG SISTEM PENGGERAK GENERATOR TENAGA GRAVITASI SEBAGAI SUMBER PENERANGAN SKALA KECIL. Skripsi thesis, UNIVERSITAS SANGGA BUANA YPKP.

R

RAHMANTO, FAJAR (2020) ANALISA STUDI PERBANDINGAN KINERJA SISTEM REM ABS DAN KONVENSIONAL MENGGUNAKAN SIMULINK MATLAB PADA KENDARAAN TUBULAR. Skripsi thesis, UNIVERSITAS SANGGA BUANA YPKP BANDUNG.

RAMDAN, ISMAIL IQBALI (2020) PENGUKURAN KINERJA MENGGUNAKAN METODE BSC BERDASARKAN PERSPEKTIF LEARNING AND GROWTH PADA PROGRAM STUDI TEKNIK INDUSTRI UNIVERSITAS SANGGA BUANA. Skripsi thesis, UNIVERSITAS SANGGA BUANA YPKP BANDUNG.

RAMDHANI, YANUAR and SUMIRAT, UUM (2020) PERHITUNGAN LAJU KOROSI UNTUK MENENTUKAN UMUR PAKAI (REMAINING SERVICE LIFE) PADA SISTEM PERAWATAN JARINGAN PIPA PRODUKSI UAP DI PEMBANGKIT LISTRIK TENAGA PANAS BUMI (PLTP) PATUHA UNIT 1. Skripsi thesis, Universitas Sangga Buana YPKP.

RIANTO, AHMAD (2020) RANCANG BANGUN MESIN DUPLIKAT KUNCI PORTABEL Design a Portable Key Duplicate Machine. Skripsi thesis, UNIVERSITAS SANGGA BUANA YPKP.

S

SYAHRONI, FERDIAN (2020) RANCANG BANGUN MESIN CNC DUA AXIS SEDERHANA BERBASIS ARDUINO UNO R3 DAN DRIVER SHIELD IC L293D. Skripsi thesis, UNIVERSITAS SANGGA BUANA YPKP.

T

TOKAN, BL. JABIR (2020) PERANCANGAN MESIN PERAJANG SINGKONG. Skripsi thesis, UNIVERSITAS SANGGA BUANA YPKP BANDUNG.

U

UBAY CARAKA, MUHAMMAD (2020) RANCANG BANGUN SISTEM DISTRIBUSI AIR BERSIH DI GEDUNG AKADEMIK XYZ. Skripsi thesis, UNIVERSITAS SANGGA BUANA YPKP.

W

Wardana, Opik and SUMIRAT, UUM (2020) ANALISA KINERJA PEMBANGKIT LISTRIK TENAGA PANAS BUMI (PLTP) PATUHA UNIT-1. Skripsi thesis, Universitas Sangga Buana YPKP.

This list was generated on Thu Apr 25 11:39:15 2024 WIB.